Creative, consumer and supply categories

Events, exhibitions and visitor experiences tender support

Events and exhibitions are temporary operating systems built around people, place, content, structures, suppliers and time. Strong bids connect purpose to capacity, access, venue boundaries, licences, emergency command, technical production and visitor evidence. This sector view turns those dependencies into controls without treating a visual or buyer notice as proof of safe live delivery.

A basic position to test

Read the market. Align the bidder, offer and delivery.

This is where we would start—not a fixed answer. The position changes with the organisation, route, buying group and live competition.

  1. 01Buyer

    We map the decision context, stakeholders, route to market and the confidence the buyer needs.

  2. 02Bidder

    We test capability, systems, people, partners, evidence and readiness gaps.

  3. 03Offer

    We align the solution, price, risk, commercial model and sector-specific dependencies.

  4. 04Delivery

    We carry commitments into mobilisation, controls, measures and retained evidence.

Sector pursuit field 73 · Creative, consumer and supply categories

Our basic working position: This is the first position we would test—not the final bid position. It changes with every buyer organisation, procurement or commercial team, evaluator group, operational user, budget owner and other stakeholder. The live opportunity, people, documents, conversations and clarifications determine the final pursuit.

Public and private contract pursuit

Same capability. Different buying system.

A events, exhibitions and visitor experiences pitch cannot be carried unchanged from a published public competition into a private sourcing decision. The solution may be similar, but authority, visibility, negotiation, risk appetite and the people shaping the decision can be very different.

Public-contract starting point

Follow the declared route—and the decision behind it.

Start with the live notice, conditions, evaluation model, timetable, clarification rules and contract.

  • define event or exhibition purpose, audience, venue, dates, capacity and operating owner
  • separate creative, content, spatial, technical, build, front-of-house and assurance workstreams
Private-contract starting point

Find the real buying group and approval path.

Brands, venues, associations and investors commission events through agency pitches, venue contracts, sponsorships and production packages.

  • Establish who initiated the purchase, who owns the budget, who can veto it and how procurement, legal and finance will shape the agreement.
  • Test incumbent relationships, negotiation room, approval gates, commercial risk and the evidence each decision-maker needs.
  • Use conversations lawfully available in the process to refine the proposition; do not assume a private RFP reveals every deciding factor.
Stakeholder alignment

The “buyer” is rarely one person.

Align audiences, sponsor, creative, production, venue, safety, accessibility, finance and suppliers.

Sector roles to test: Event owner, curator or programme sponsor; Venue, safety and emergency leads; Design, conservation and technical teams; Visitors, access and front-of-house teams; Commercial and supplier managers.

When focused bid writing is enough

The bidder is ready; the response needs precision.

Use focused writing when the events, exhibitions and visitor experiences offer, price, delivery model, responsibilities and approved evidence already withstand challenge. We then align them to the question, stakeholder, evaluation logic and response architecture without pretending prose can repair the underlying business.

When end-to-end bid management is stronger

Strengthen the bidder, then build the bid.

Use end-to-end management when qualification, solution design, process, team, partners, evidence, commercial logic or mobilisation still needs work. The pursuit becomes a project: gaps are exposed, capability is implemented, owners decide and the written answer grows from a stronger operating position.

Assurance & Delivery Lattice relevance

Candidate lifecycle movements: Discover → Design → Prove → Renew. Useful operating lenses to test include Kaizen, disciplined evidence and controlled handover. They are selected proportionately; they are not certification claims or a substitute for the live contract.

Explore Achmed Esser's Assurance & Delivery Lattice →
APMP relevance

Relevant practice here can include customer requirements, win themes, solution-story alignment, proposal reviews and learning. We apply the parts that fit the pursuit rather than forcing every competition through one template.

See APMP's winning-business lifecycle →

Start with purpose, audience and live consequence

Public evidence The dated source set describes event and visitor-experience delivery through buyer demand ranging from corporate gatherings and national public events to permanent galleries, temporary displays and transformed attractions. The source boundary is the records describe intended services and do not show visitor, safety or cultural outcomes. [ 010, 011, 012, 013, 014 ]

Evidence-linked insight · What this changes The procurement consequence is that the operating design changes with who attends, why they come, what they encounter, how long they stay and what happens if the experience fails. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 010, 011, 012, 013, 014 ]

Where we would start first Use this as a bid gateway. define purpose, priority audience, expected response, venue, date, duration, capacity, content, operating owner and highest-consequence failure. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: event or exhibition outcome-and-consequence brief.
  • event and visitor-experience delivery challenge question: can the team explain what success means beyond attendance and visual finish.

Separate experience, event operation and physical build

Public evidence The dated source set describes event and visitor-experience delivery through procurements dividing event management and assurance while museum routes combine design development, fabrication, fit-out and opening. The source boundary is the final documents allocate duties and may package stages differently. [ 010, 011, 012, 013, 014 ]

Evidence-linked insight · What this changes The procurement consequence is that creative content, venue operation, live production and construction-like work use different competence, authority, records and acceptance. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 010, 011, 012, 013, 014 ]

Where we would start first Use this as a bid gateway. draw workstreams for strategy, content, spatial design, technical production, build, venue, front of house, assurance and evaluation with interfaces. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: discipline and responsibility architecture.
  • event and visitor-experience delivery challenge question: does every design choice have an operational, safety and maintenance owner.

Qualify the route before fixing the delivery team

Public evidence The dated source set describes event and visitor-experience delivery through framework pipeline, open competition, approved-list and design-and-build routes with different scale, procedure and supplier structures. The source boundary is notice stage, values, dates and commercial terms require live verification. [ 009, 010, 011, 012, 013 ]

Evidence-linked insight · What this changes The procurement consequence is that the right consortium and evidence differ for repeatable small events, national public delivery, independent assurance and a fixed museum fit-out. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 009, 010, 011, 012, 013 ]

Where we would start first Use this as a bid gateway. record procedure, lot, scope stage, contract form, venue status, design maturity, buyer team, opening date, participation and unresolved documents. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: procurement-route and delivery-form decision register.
  • event and visitor-experience delivery challenge question: has the proposal inherited a contract or role assumption absent from the notice.

Expose the reasons a beautiful bid remains unsafe

Public evidence The dated source set describes event and visitor-experience delivery through official requirements for planning, responsibilities, crowd control, incidents and emergency coordination beside exhibition build obligations. The source boundary is the exact statutory and venue controls depend on event facts and competent assessment. [ 001, 002, 004, 005, 006, 007, 008 ]

Evidence-linked insight · What this changes The procurement consequence is that unproven capacity, shared-site authority, licensing, temporary works, weather, fire, access or show-stop decisions can invalidate the creative plan. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 001, 002, 004, 005, 006, 007, 008 ]

Where we would start first Use this as a bid gateway. red-team venue control, audience profile, licences, capacity, structures, contractors, security, fire, medical, accessibility, weather, command and cancellation. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: award-barrier register tied to stop or treat decisions.
  • event and visitor-experience delivery challenge question: which unresolved interface could prevent permission to open on the planned date.

Baseline the venue through the visitor’s movement

Public evidence The dated source set describes event and visitor-experience delivery through HSE guidance covering venue suitability, crowd movement and emergency response while buyer projects alter spaces and visitor attractions. The source boundary is public guidance cannot determine safe capacity for a specific site or design. [ 001, 002, 012, 014 ]

Evidence-linked insight · What this changes The procurement consequence is that area alone misses arrival, search, queues, pinch points, stairs, viewing, welfare, crossflow, exits, transport and unfamiliar visitor behaviour. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 001, 002, 012, 014 ]

Where we would start first Use this as a bid gateway. survey site, control boundaries, utilities, ground, structures, routes, exits, transport, neighbours, weather exposure, accessibility, sightlines and operational constraints. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: annotated venue baseline and visitor-flow model.
  • event and visitor-experience delivery challenge question: has capacity been derived from the limiting route and operating condition rather than aspiration.

Build the visitor and operating sequence before copy

Public evidence The dated source set describes event and visitor-experience delivery through event and exhibition buyers requiring venue, content, design, build, speakers, branding, galleries and public-facing delivery. The source boundary is the source set does not approve a universal sequence or design solution. [ 010, 011, 012, 013, 014 ]

Evidence-linked insight · What this changes The procurement consequence is that experience breaks at discovery, booking, arrival, queue, orientation, transition, participation, rest, exit and post-visit contact as well as at the main exhibit. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 010, 011, 012, 013, 014 ]

Where we would start first Use this as a bid gateway. map visitor states beside load-in, briefing, opening, live monitoring, replenishment, incident, close, de-rig and reinstatement states. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: dual visitor-and-operations service blueprint.
  • event and visitor-experience delivery challenge question: can staff see how a visitor need triggers an operational decision at every stage.

Show evaluators how the venue becomes ready

Public evidence The dated source set describes event and visitor-experience delivery through museum routes linking design stages, fit-out, circulation spaces and opening while event guidance requires competent planning and contractors. The source boundary is a programme or render is not evidence that installed conditions are safe and accepted. [ 001, 002, 008, 012, 013 ]

Evidence-linked insight · What this changes The procurement consequence is that evaluators need the sequence from survey and design approval through fabrication, installation, inspection, commissioning, rehearsal, defects and opening authority. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 001, 002, 008, 012, 013 ]

Where we would start first Use this as a bid gateway. offer a verification matrix with responsible designer, temporary works, technical tests, accessibility review, emergency exercise, defect class and signatory. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: design-to-opening assurance and witness matrix.
  • event and visitor-experience delivery challenge question: what objective evidence allows the responsible owner to open rather than postpone.

Reconcile curator, venue, visitor and responder concerns

Public evidence The dated source set describes event and visitor-experience delivery through source material spanning content, visitor attraction, event planning, contractor safety, licensing, fire, security and accessibility. The source boundary is the client and venue retain different decisions depending on control of place and activity. [ 001, 002, 004, 005, 007, 012 ]

Evidence-linked insight · What this changes The procurement consequence is that curatorial integrity, visitor enjoyment, safe flow, emergency access, conservation, commercial income and local impact can conflict near opening. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 001, 002, 004, 005, 007, 012 ]

Where we would start first Use this as a bid gateway. map acceptance and escalation for sponsor, curator, venue, safety, fire, security, accessibility, front-of-house, technical, emergency and community stakeholders. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: stakeholder concern and live-decision matrix.
  • event and visitor-experience delivery challenge question: who has final authority when programme pressure conflicts with a safety or conservation hold point.

Price management, production and pass-through separately

Public evidence The dated source set describes event and visitor-experience delivery through event and exhibition routes spanning advisory services, venues, speakers, creative work, technical delivery, design and physical fit-out. The source boundary is notice estimates do not disclose final supplier quotes, venue terms or change allocation. [ 010, 011, 012, 013 ]

Evidence-linked insight · What this changes The procurement consequence is that a fixed total hides supplier margins, production uncertainty, access premiums, cancellation, contingency, storage and venue-controlled cost. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 010, 011, 012, 013 ]

Where we would start first Use this as a bid gateway. separate professional fees, design stages, build, equipment, labour, venue, catering, travel, security, insurance, contingency, cancellation and de-rig. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: open estimate book with approval and reconciliation rules.
  • event and visitor-experience delivery challenge question: can the buyer identify which cost changes when attendance, venue or opening date moves.

Mobilise towards a rehearsed opening decision

Public evidence The dated source set describes event and visitor-experience delivery through fixed-opening exhibition projects and event services requiring multiple contractors, venues, content, equipment and live support. The source boundary is the public notices do not prove design maturity, access, supplier capacity or approval readiness. [ 001, 002, 011, 012, 013, 014 ]

Evidence-linked insight · What this changes The procurement consequence is that calendar completion is not operational readiness when objects, structures, systems, signs, staff, licences or emergency interfaces remain unverified. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 001, 002, 011, 012, 013, 014 ]

Where we would start first Use this as a bid gateway. control surveys, design freeze, procurement, fabrication, logistics, installation, testing, training, emergency exercise, soft opening, defects, go or no-go and rollback. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: integrated opening-readiness and fallback plan.
  • event and visitor-experience delivery challenge question: which critical path has no recoverable option if an approval or component slips.

Apply legal controls to the real premises and activity

Public evidence The dated source set describes event and visitor-experience delivery through health and safety, licensing, fire, protective-security, equality and construction sources with distinct triggers and territorial or commencement questions. The source boundary is the dossier is not a legal determination for any event, premises or build package. [ 003, 004, 005, 006, 007, 008 ]

Evidence-linked insight · What this changes The procurement consequence is that saying an event is compliant conceals which person, place, capacity, work and date activate each duty or approval. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 003, 004, 005, 006, 007, 008 ]

Where we would start first Use this as a bid gateway. create an applicability register for premises, activity, audience, capacity, alcohol or entertainment, structures, works, security tier, access and responsible roles. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: dated legal, licence and standards applicability schedule.
  • event and visitor-experience delivery challenge question: has any future or conditional duty been presented as universally in force.

Compose partners around place and live competence

Public evidence The dated source set describes event and visitor-experience delivery through buyers seeking event managers, independent assurance, designers, fit-out contractors and repeatable exhibition-build capacity. The source boundary is public appointment or supplier naming does not reserve staff, equipment, venue access or specialist approval. [ 001, 002, 010, 012, 013 ]

Evidence-linked insight · What this changes The procurement consequence is that many subcontractors increase interface risk across design, rigging, power, structures, security, stewarding, medical, access and de-rig. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 001, 002, 010, 012, 013 ]

Where we would start first Use this as a bid gateway. map venue, designer, fabricator, technical producer, stewarding, security, medical, access, logistics and assurance partners to authority and evidence. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: event supply-chain interface and substitution map.
  • event and visitor-experience delivery challenge question: can the lead team see and control every safety-critical subcontract and hand-off.

Measure safe, accessible and purposeful experience

Public evidence The dated source set describes event and visitor-experience delivery through event and exhibition records targeting public presence, corporate purpose, renewed attractions and changing visitor displays. The source boundary is the buyers do not publish one approved outcome or satisfaction model for reuse. [ 001, 002, 007, 010, 014 ]

Evidence-linked insight · What this changes The procurement consequence is that attendance and headline satisfaction hide queue exclusion, inaccessible content, early departure, incident, no-show, weak learning and unmet community goals. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 001, 002, 007, 010, 014 ]

Where we would start first Use this as a bid gateway. define attendance, capacity utilisation, queue, dwell, route completion, access fulfilment, defect, incident, complaint, learning and purpose-specific outcome measures. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: visitor and operational KPI dictionary with denominators.
  • event and visitor-experience delivery challenge question: does the measure expose who could not enter, participate, understand or evacuate equally.

Strengthen security without damaging flow or dignity

Public evidence The dated source set describes event and visitor-experience delivery through emergency guidance and protective-security legislation sitting beside equality duties and crowded public-event planning. The source boundary is security measures and statutory requirements depend on threat, premises, event, capacity and commencement. [ 001, 002, 006, 007 ]

Evidence-linked insight · What this changes The procurement consequence is that searches, barriers, credentials and restricted routes can create queues, crush points, exclusion or emergency obstruction if designed separately. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 001, 002, 006, 007 ]

Where we would start first Use this as a bid gateway. jointly model threat, search demand, queue space, accessible screening, hostile-vehicle and barrier interfaces, emergency access, communication and fallback. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: integrated security, crowd and accessibility test record.
  • event and visitor-experience delivery challenge question: does the protective measure create a larger safety or access failure under peak arrival.

Keep Bid Champions outside live command

Public evidence The dated source set describes event and visitor-experience delivery through primary sources enabling pursuit research without approved Bid Champions evidence of venue control, event assurance or visitor results. The source boundary is bid support cannot become organiser, responsible person, designer, licensee or emergency commander by implication. [ 001, 002, 009, 010 ]

Evidence-linked insight · What this changes The procurement consequence is that solution and evidence work can be coordinated while the client and competent delivery specialists retain live statutory and operational decisions. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 001, 002, 009, 010 ]

Where we would start first Use this as a bid gateway. use support for requirement maps, evidence design, reviews and commercial challenge; reserve safety judgement, licence applications, design sign-off and opening authority. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: pursuit responsibility map with protected live roles.
  • event and visitor-experience delivery challenge question: does the proposed governance assign a live decision to someone without competence or control.

Retain an event-readiness capability after the bid

Public evidence The dated source set describes event and visitor-experience delivery through framework and approved-list routes supporting repeated events and temporary exhibitions rather than one isolated delivery. The source boundary is reusable controls must still be tailored to audience, site, activity and current law each time. [ 001, 002, 010, 013 ]

Evidence-linked insight · What this changes The procurement consequence is that templates become dangerous when they preserve old capacities, contacts, licences, designs or assumptions without a fresh site assessment. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 001, 002, 010, 013 ]

Where we would start first Use this as a bid gateway. hand over experience brief, venue baseline, responsibility map, supplier assurance, readiness tests, command plan, KPI definitions, debrief and source register. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: version-controlled event and exhibition assurance library.
  • event and visitor-experience delivery challenge question: can the client adapt the control set while forcing a new applicability and venue review.

Use buyer notices as bounded route signals

Public evidence The dated source set describes event and visitor-experience delivery through five current public records spanning national framework planning, corporate events, design-and-build, approved contractors and gallery transformation. The source boundary is notice content may be superseded and excludes much of the final specification and contract. [ 010, 011, 012, 013, 014 ]

Evidence-linked insight · What this changes The procurement consequence is that the sample shows category variety and interfaces but cannot prove delivery, predict evaluation or establish sector-wide demand. Evaluators can only trust the promise when visitor purpose, place, safe capacity, live decision and recoverable experience has an owner, a dated baseline, a verification method and an explicit exception process. [ 010, 011, 012, 013, 014 ]

Where we would start first Use this as a bid gateway. record official identifier, version, date, buyer, extracted scope signal and uncertainty, then reopen the source for each real pursuit. Preserve assumptions and unresolved dependencies in the risk register instead of converting them into unsupported promises about event and visitor-experience delivery.

  • event and visitor-experience delivery evidence focus: dated event-market evidence and change log.
  • event and visitor-experience delivery challenge question: has an opening ambition, value or buyer description been turned into an unsupported result claim.

Relevant anonymised case study

Securing a seven-figure public-sector award for live events and exhibition production

An anonymised Bid Champions client was selected by Nuclear Decommissioning Authority (NDA) to provide live events and exhibition production. The public award record places the opportunity in the £1m–£4.9m band.

Buyer
Nuclear Decommissioning Authority (NDA)
Published value band
£1m–£4.9m
Outcome
Contract award recorded

The precise tender-support workstream is confidential. The full case separates Bid Champions’ recorded support, the client’s solution and commitments, and the buyer’s award decision.

Read the complete case study

Live-pursuit check

What we would verify before fixing the strategy.

For a live opportunity, we would recheck the applicable law and standards, the buyer's latest notice and documents, qualification route, amendments, commercial assumptions and delivery conditions. This keeps the analysis useful without treating a general market position as a substitute for the actual competition.

Priority public records to recheck: Event safety; Planning for incidents and emergencies; Terrorism (Protection of Premises) Act 2025; Event Management & Delivery Framework; Event Management; Boathouse 6 - Exhibition Design & Build Appointment; Temporary Exhibition Build Contractors Approved List; PAN3287 - LMAG Voices of Leicester Exhibition Design and Fit Out.

Independent verification checks

The public references supporting the evidence points above remain available so a bidder, specialist or decision-maker can test the position against the original authority.

Open 14 public references used to test this sector position
  1. Event safety — Health and Safety Executive
  2. Planning for incidents and emergencies — Health and Safety Executive
  3. Health and Safety at Work etc. Act 1974 — The National Archives
  4. Licensing Act 2003 — The National Archives
  5. Regulatory Reform (Fire Safety) Order 2005 — The National Archives
  6. Terrorism (Protection of Premises) Act 2025 — The National Archives
  7. Equality Act 2010 — The National Archives
  8. Construction (Design and Management) Regulations 2015 — The National Archives
  9. Procurement Act 2023 — The National Archives
  10. Event Management & Delivery Framework — Department for Culture, Media and Sport
  11. Event Management — Midland Heart Limited
  12. Boathouse 6 - Exhibition Design & Build Appointment — National Museum of the Royal Navy
  13. Temporary Exhibition Build Contractors Approved List — Victoria and Albert Museum
  14. PAN3287 - LMAG Voices of Leicester Exhibition Design and Fit Out — Leicester City Council