Energy, environment and utilities

Carbon, net zero and sustainability tender support

Carbon and sustainability bids earn trust when organisational, contract and asset boundaries are separated; activity data, factor versions and assumptions are traceable; targets connect to funded actions; climate resilience is not confused with mitigation; and every public claim has governed evidence.

A basic position to test

Read the market. Align the bidder, offer and delivery.

This is where we would start—not a fixed answer. The position changes with the organisation, route, buying group and live competition.

  1. 01Buyer

    We map the decision context, stakeholders, route to market and the confidence the buyer needs.

  2. 02Bidder

    We test capability, systems, people, partners, evidence and readiness gaps.

  3. 03Offer

    We align the solution, price, risk, commercial model and sector-specific dependencies.

  4. 04Delivery

    We carry commitments into mobilisation, controls, measures and retained evidence.

Sector pursuit field 52 · Energy, environment and utilities

Our basic working position: This is the first position we would test—not the final bid position. It changes with every buyer organisation, procurement or commercial team, evaluator group, operational user, budget owner and other stakeholder. The live opportunity, people, documents, conversations and clarifications determine the final pursuit.

Public and private contract pursuit

Same capability. Different buying system.

A carbon, net zero and sustainability pitch cannot be carried unchanged from a published public competition into a private sourcing decision. The solution may be similar, but authority, visibility, negotiation, risk appetite and the people shaping the decision can be very different.

Public-contract starting point

Follow the declared route—and the decision behind it.

Buyer settings evidenced in the sector dossier: Department for Energy Security and Net Zero; City of London Corporation; Hull City Council.

Start with the live notice, conditions, evaluation model, timetable, clarification rules and contract.

  • Classify the opportunity before selecting proof: inventory and disclosure, target setting, climate risk, energy audit, feasibility, design, programme management, digital platform, contract emissions or performance verification. Map the decision, boundary, asset, users and required assurance. Reject case studies that share only a carbon label.
  • Verify contracting authority, procurement start date, contract category and value, notice version, stated participation conditions, schedules and tender instructions. Use the buyer's exact template where supplied. Keep the supplier-level Carbon Reduction Plan, tender response and contract-specific reduction plan separate unless the documents explicitly connect them.
Private-contract starting point

Find the real buying group and approval path.

Corporates, investors and supply chains buy baselining, transition plans, reporting and implementation support through consulting panels and performance programmes.

  • Establish who initiated the purchase, who owns the budget, who can veto it and how procurement, legal and finance will shape the agreement.
  • Test incumbent relationships, negotiation room, approval gates, commercial risk and the evidence each decision-maker needs.
  • Use conversations lawfully available in the process to refine the proposition; do not assume a private RFP reveals every deciding factor.
Stakeholder alignment

The “buyer” is rarely one person.

Align board sponsors, finance, operations, procurement, property, data, legal and suppliers.

Sector roles to test: Department for Energy Security and Net Zero; City of London Corporation; Hull City Council; Derry City and Strabane District Council; client technical, commercial, legal and governance owners.

When focused bid writing is enough

The bidder is ready; the response needs precision.

Use focused writing when the carbon, net zero and sustainability offer, price, delivery model, responsibilities and approved evidence already withstand challenge. We then align them to the question, stakeholder, evaluation logic and response architecture without pretending prose can repair the underlying business.

When end-to-end bid management is stronger

Strengthen the bidder, then build the bid.

Use end-to-end management when qualification, solution design, process, team, partners, evidence, commercial logic or mobilisation still needs work. The pursuit becomes a project: gaps are exposed, capability is implemented, owners decide and the written answer grows from a stronger operating position.

Assurance & Delivery Lattice relevance

Candidate lifecycle movements: Discover → Shape → Prove → Deliver. Useful operating lenses to test include Nachweisführung, continuous improvement and controlled handover. They are selected proportionately; they are not certification claims or a substitute for the live contract.

Explore Achmed Esser's Assurance & Delivery Lattice →
APMP relevance

Relevant practice here can include opportunity qualification, competitive positioning, solution proof, risk review and implementation planning. We apply the parts that fit the pursuit rather than forcing every competition through one template.

See APMP's winning-business lifecycle →

Carbon procurement separates evidence, systems, strategy and delivery

Evidence-linked insight · What this changes The reviewed market includes national climate services, utility-management software with invoice validation, building-and-land decarbonisation feasibility, and a district energy strategy. These commissions require different data, engineering, software, policy and stakeholder capabilities. A corporate footprint or net-zero pledge does not prove delivery across those service lines. [ 013, 014, 015, 016 ]

Where we would start first Classify the opportunity before selecting proof: inventory and disclosure, target setting, climate risk, energy audit, feasibility, design, programme management, digital platform, contract emissions or performance verification. Map the decision, boundary, asset, users and required assurance. Reject case studies that share only a carbon label. [ 013, 014, 015, 016 ]

Policy applicability follows buyer, value and procurement context

Public evidence PPN 006 addresses Carbon Reduction Plans in major central-government contracts and includes scope, relevance and proportionality conditions. PPN 016 provides an optional carbon-reduction contract schedule for in-scope organisations where relevant and proportionate. Neither document is a universal requirement for all UK public procurement. [ 001, 002, 007, 008 ]

Where we would start first Verify contracting authority, procurement start date, contract category and value, notice version, stated participation conditions, schedules and tender instructions. Use the buyer's exact template where supplied. Keep the supplier-level Carbon Reduction Plan, tender response and contract-specific reduction plan separate unless the documents explicitly connect them. [ 001, 002, 007, 008, 013, 014, 015, 016 ]

One carbon number cannot answer every decision

Evidence-linked insight · What this changes An organisational inventory, a product footprint, whole-life asset assessment, financed-emissions analysis and contract greenhouse-gas account have different subjects and rules. Combining them without reconciliation creates omissions or double counting. A reduction in one boundary can coincide with an increase elsewhere. [ 005, 007, 008, 009, 010, 012 ]

Where we would start first State reporting entity, operational or financial control approach, geography, period, gases, scopes, lifecycle stages, exclusions and intended use. Draw the contract boundary against the corporate inventory and client boundary. Record transfers so a claimed saving is not counted by several parties as an exclusive result. [ 005, 007, 008, 009, 010, 012 ]

Inventory design should precede data collection

Evidence-linked insight · What this changes A greenhouse-gas inventory requires consistent organisational boundaries, emission categories, reporting period, methods and controls. Starting with whatever spreadsheets are available can produce an attractive total that excludes material activities or mixes ownership approaches. Recalculation rules matter when structures and methods change. [ 005, 009, 010, 012 ]

Where we would start first Create an inventory management plan defining sources, scope classification, materiality, estimates, factor hierarchy, consolidation, base year, recalculation threshold, review and sign-off. Link every line to an accountable data owner and evidence record. State known exclusions with an improvement plan rather than silently presenting them as zero. [ 005, 009, 010, 012 ]

Scopes 1, 2 and 3 require category-level reasoning

Evidence-linked insight · What this changes Direct fuel use, purchased energy and value-chain activities rely on different owners and evidence. Scope 3 can be material while remaining difficult to measure, and reporting frameworks may set distinct minimums. Market-based and location-based electricity results answer related but different questions and should not be merged casually. [ 005, 009, 010, 012 ]

Where we would start first Map sources to scope and category, document treatment of landlord or tenant supplies, leased assets, business travel, purchased goods, waste and subcontractors, and reconcile utility evidence to invoices and meters. Present parallel electricity views when required, including instrument quality and residual assumptions. Avoid implying complete Scope 3 coverage. [ 005, 009, 010, 012, 014 ]

Activity data quality controls the usefulness of the result

Evidence-linked insight · What this changes Invoices, meters, mileage, fuel records, procurement systems and supplier returns can disagree in period, units and coverage. Spend-based estimates may support screening but usually provide a weaker operational signal than measured activity. Missing readings, estimated bills and estate changes need explicit treatment. [ 009, 010, 012, 014 ]

Where we would start first Set a data hierarchy and automated checks for unit, date, duplication, completeness, outliers and meter lineage. Reconcile invoices to fiscal and submeter structures where relevant. Record estimation method, uncertainty and correction workflow. Preserve the raw input, transformation and approved result so recalculation is reproducible. [ 009, 010, 012, 014 ]

Factor year and method must travel with every figure

Public evidence The Department for Energy Security and Net Zero publishes company-reporting conversion factors annually, with 2026 materials released in June 2026. Factor changes can reflect source data and methodology, so comparing inventories calculated with different editions without explanation may misstate operational movement. [ 009, 010 ]

Where we would start first Record factor publisher, edition, table, fuel or activity, unit, geography and any well-to-tank treatment beside the calculation. Lock a reviewed factor set for each reporting cycle. Explain restatement policy and isolate changes caused by operations, boundary, data correction and factor revision. [ 009, 010, 012 ]

A target needs a stable base year and change policy

Evidence-linked insight · What this changes Acquisitions, disposals, outsourcing, insourcing, improved data and method changes can alter an emissions series independently of real performance. An old baseline may also be unrepresentative. Without a documented recalculation rule, progress percentages can change according to convenience rather than consistent governance. [ 003, 007, 009, 010, 012 ]

Where we would start first Evidence base-year selection, coverage, data quality and approval. Define structural and methodological triggers for recalculation, with materiality threshold and audit trail. Report absolute and relevant intensity measures together where useful, explaining denominators. Keep target progress separate from avoided emissions and counterfactual estimates. [ 003, 007, 009, 010, 012 ]

Net-zero language needs a governed target architecture

Evidence-linked insight · What this changes A long-term ambition does not specify boundary, interim milestones, reduction pathway, residual treatment or accountability. Different public bodies use different target dates and operational definitions. A consultant should not convert an aspiration into an assurance statement without evidence and formally adopted decisions. [ 003, 007, 010, 011, 012, 013, 014, 016 ]

Where we would start first Define target type, boundary, baseline, milestone years, reduction versus neutralisation, ownership and review process. Connect each milestone to an investable action portfolio and decision calendar. Use conditional scenarios where funding, grid change, technology or third-party behaviour is uncertain, and obtain client approval before publishing target claims. [ 003, 007, 010, 011, 012, 013, 014, 016 ]

The pathway must join engineering, finance and operations

Evidence-linked insight · What this changes Carbon reduction may depend on demand management, fabric, controls, heat, power, fleet, procurement, behaviour and asset replacement. Measures interact: sequencing affects cost, savings and disruption. A list of opportunities without baseline, dependencies, constraints and approvals is not an executable decarbonisation plan. [ 003, 006, 011, 014, 015, 016 ]

Where we would start first Build measure cards with technical scope, site, baseline, capital and operating cost, energy and carbon method, uncertainty, maintenance, dependencies, delivery window, owner and verification. Model packages and constraints, not isolated paybacks. Keep feasibility confidence distinct from approved business case and completed installation. [ 003, 006, 011, 014, 015, 016 ]

Contract emissions require a baseline the parties can operate

Public evidence PPN 016's optional schedule supports contract-specific reporting, targets and a supplier reduction plan where used. It supplements rather than replaces the supplier-level participation approach in PPN 006. The executed contract, not a generic policy summary, defines obligations for a particular appointment. [ 007, 008 ]

Where we would start first Reconcile tender commitments with the schedule, service boundary, subcontractors, data rights, target dates, reporting frequency and change process. Agree the baseline period and treatment of scope changes before measuring performance. Price data collection, supplier engagement, assurance and improvement activity as delivery, not free narrative support. [ 007, 008, 013, 014, 015, 016 ]

Embodied, operational and user carbon need consistent scenarios

Evidence-linked insight · What this changes Estate and infrastructure decisions can shift emissions between construction, operation, maintenance and end of life. A low operational-energy option may require more material or replacement, while deferred work may preserve carbon but worsen service outcomes. Comparisons depend on functional equivalence and study period. [ 003, 009, 011, 015, 016 ]

Where we would start first State function, asset life, reference study period, lifecycle coverage, demand scenario, grid assumptions, maintenance and end-of-life treatment. Use comparable options and sensitivity analysis. Report carbon beside cost, risk and performance rather than declaring a technically inferior option preferable from one emissions subtotal. [ 003, 009, 011, 015, 016 ]

Climate adaptation is related to, but not replaced by, mitigation

Evidence-linked insight · What this changes Reducing greenhouse-gas emissions addresses mitigation, while managing heat, flood, drought, subsidence and extreme-weather exposure addresses adaptation. Measures can reinforce or conflict with each other. A net-zero strategy that ignores physical risk may leave assets and services vulnerable despite a falling inventory. [ 003, 011, 012, 013 ]

Where we would start first Use separate but connected risk and emissions workstreams. Define climate scenarios, time horizons, hazard, exposure, vulnerability, service consequence and adaptation ownership. Test whether mitigation measures remain resilient and whether adaptation changes emissions. Avoid presenting a carbon calculation as a climate-risk assessment. [ 003, 011, 012, 013 ]

Residual emissions and claims need heightened scrutiny

Evidence-linked insight · What this changes Offsets, renewable instruments, avoided emissions and removals describe different mechanisms. Central-government reporting guidance requires defined treatment and cautions that offsets do not meet Greening Government Commitment targets. Buying a certificate does not demonstrate that operational emissions fell or that every net-zero claim is justified. [ 010, 012 ]

Where we would start first Prioritise measured reduction, report gross emissions, and present instruments or neutralisation separately with vintage, standard, ownership, retirement, additionality and permanence evidence where applicable. Subject external claims to technical and legal review. State limitations and never use avoided emissions as a subtraction from the inventory without an authorised method. [ 009, 010, 012 ]

A platform is only as reliable as its controls and users

Evidence-linked insight · What this changes The City of London tender combines utility data, spend, invoice validation, submeter logic and sustainability objectives. Software can improve workflow, but configuration, master data, integration, exception handling, audit logs, permissions and user adoption determine whether calculated results remain trustworthy. [ 014 ]

Where we would start first Demonstrate source-to-report lineage, validation rules, meter hierarchy, factor governance, role-based access, change history, exports, backups and exit format. Include data cleansing and acceptance tests in mobilisation. Keep system availability and invoice accuracy metrics separate from verified carbon reduction outcomes. [ 009, 010, 012, 014 ]

Supplier engagement needs category and contract leverage

Evidence-linked insight · What this changes Value-chain emissions often depend on supplier data and choices that the reporting organisation cannot directly control. Generic questionnaires can create burden without decision value, while estimated category totals may hide priority contracts. Procurement conditions and contract schedules provide mechanisms only where properly scoped and managed. [ 007, 008, 009, 010, 012 ]

Where we would start first Segment categories by estimated materiality, influence, data maturity and renewal date. Ask suppliers for defined boundary, period, factor method and assurance rather than an unsupported total. Connect improvement requests to specifications, evaluation or contract management where lawful and proportionate, with SME burden and data confidentiality considered. [ 001, 002, 007, 008, 009, 010 ]

Carbon governance must reach budget and asset decisions

Evidence-linked insight · What this changes An inventory owner cannot deliver change alone. Finance, estates, operations, procurement, fleet, digital, risk and communications control key inputs and interventions. Targets without delegated authority, investment gates, escalation and performance review are vulnerable to becoming reporting exercises detached from delivery. [ 003, 006, 011, 012, 013, 014, 015, 016 ]

Where we would start first Propose a governance map covering data certification, methodology approval, measure sponsorship, capital decision, claim approval and audit. Put carbon implications into business-case and change-control templates. Report issues with accountable owner and resolution date, and reserve strategic appetite or funding decisions to the client. [ 003, 006, 011, 012, 013, 014, 015, 016 ]

Assurance depth should follow claim consequence

Evidence-linked insight · What this changes Data-owner checks, internal review and independent assurance provide different confidence. An audited financial control environment does not automatically assure carbon calculations, and a verified inventory does not validate future savings. High-profile targets, contract incentives and external statements may justify stronger review. [ 005, 009, 010, 012 ]

Where we would start first Define assertion, criteria, evidence, materiality, reviewer competence and assurance level before commissioning review. Separate inventory assurance, model verification and post-installation measurement. Keep an issue log and management response, and phrase public claims within the exact assured boundary and reporting period. [ 005, 009, 010, 012 ]

Commercial models should allocate data and savings risk explicitly

Evidence-linked insight · What this changes Carbon services may be fixed-fee studies, licences, resource schedules, task orders or performance-linked programmes. Price exposure depends on site count, data condition, survey effort, stakeholder rounds, modelling scenarios, integration, assurance and technology change. Savings guarantees require a defined baseline and adjustment method. [ 013, 014, 015, 016 ]

Where we would start first Price from a volume-and-assumption schedule covering assets, meters, categories, interviews, options, reports, licences, integrations and review cycles. State client inputs and change triggers. Where fees depend on savings, define weather, occupancy, tariff, service-level and boundary adjustments plus independent dispute evidence. [ 013, 014, 015, 016 ]

Mobilisation should establish a controlled emissions baseline

Evidence-linked insight · What this changes Early carbon programmes can stall because meter lists, estate boundaries, supplier records, previous calculations and target definitions disagree. If these are not reconciled, dashboards and measure appraisals inherit uncertainty. The first phase should expose and prioritise data defects before headline reporting. [ 009, 010, 012, 014, 015 ]

Where we would start first Offer a mobilisation audit of boundary, obligations, systems, meters, factors, baseline, targets, projects, owners and claims. Produce a data-gap heatmap, approved methods, delivery backlog and decision plan. Make acceptance contingent on traceability and controlled exceptions, not merely loading records into a new platform. [ 009, 010, 012, 014, 015 ]

A strong submission reconciles ambition with calculation

Evidence-linked insight · What this changes The City of London tender publishes weighted technical, commercial and responsible-procurement criteria, while other examples use different procedures and scales. Evaluators need to see a credible service and a credible supplier response, not an ambitious environmental statement disconnected from resources, system controls or price. [ 013, 014, 015, 016 ]

Where we would start first Map each question to method, named role, artefact, timetable, evidence and measurable control. Reconcile carbon commitments across qualification response, technical answer, programme, pricing and contract schedules. Red-team boundary, factor, baseline, target and savings claims, correcting anything that cannot be reproduced or delivered. [ 001, 002, 007, 008, 013, 014, 015, 016 ]

Measures must separate inventory change, project saving and service value

Evidence-linked insight · What this changes Tonnes reported, audits completed and projects identified are outputs. Actual energy reduction, verified emissions movement, improved resilience and investable pipeline are different outcomes. Grid changes, weather, occupancy, production and portfolio movement can affect totals independently of the consultant's work. [ 003, 009, 010, 011, 012, 013, 014, 015, 016 ]

Where we would start first Define baselines, adjustment rules, measurement frequency, confidence and accountable owner for each metric. Report gross inventory movement, implemented project savings and advisory contribution separately. Use ranges where evidence warrants them, and do not promise net zero, cost savings or funding decisions outside supplier control. [ 003, 009, 010, 011, 012 ]

Carbon bids fail when labels outrun the evidence

Evidence-linked insight · What this changes Recurring weaknesses include applying PPNs universally, mixing organisational and contract footprints, using an outdated factor silently, reporting spend estimates as measured data, omitting material categories, claiming avoided emissions as reductions, relying on uncosted measures, and treating offsets or software as proof of decarbonisation. [ 007, 008, 009, 010, 012, 014 ]

Where we would start first Test every number for subject, period, units, source, method, reviewer and decision use. Test every promise for owner, funding, technical feasibility, dependency and verification. Where evidence is incomplete, disclose the gap and improvement route. Never invent reductions, client endorsements, target validation or assurance status. [ 007, 008, 009, 010, 012, 014 ]

A Bid Strengthening Plan should convert carbon gaps into controls

Where we would start first Prioritise the live opportunity: confirm PPN and reporting applicability; freeze inventory and contract boundaries; validate the factor set; reconcile base year; rank data gaps; connect targets to costed measures; define contract-reporting duties; secure engineering and assurance capacity; and establish a claims-approval route. [ 005, 006, 007, 008, 009, 010, 012, 013, 014, 015, 016 ]

Where we would start first Assign each action an owner, due date, acceptance evidence, tender linkage and fallback. Keep unresolved material assumptions in the approval record and commercial qualification. Retain the inventory plan, factor register, measure cards and governance after submission so pursuit work strengthens real delivery capability. [ 013, 014, 015, 016 ]

Carbon proof needs comparable boundaries and attributable results

Evidence-linked insight · What this changes A procurement notice shows what a buyer sought or awarded, not a supplier's achieved emissions reduction. Credible evidence states boundary, baseline, method, factor year, intervention, measured period, adjustments, assurance and the supplier's role. A percentage without those elements cannot be safely transferred to another context. [ 013, 014, 015, 016 ]

Where we would start first Create a permissioned proof ledger linking each bid claim to calculations, source files, client approval and limitations. Use redacted inventories, verified project records or references where authorised. Until evidence is independently checked, use bounded method and capability statements rather than fabricated savings, awards or testimonials. [ 009, 010, 013, 014, 015, 016 ]

Clients retain target, investment and claims decisions

Evidence-linked insight · What this changes The client determines strategic ambition, reporting appetite, capital allocation, operational disruption, risk acceptance and external statements. A supplier can analyse options and recommend controls, but cannot guarantee funding, user behaviour, grid conditions, third-party data, authority decisions or achievement of the client's long-term target. [ 003, 011, 012, 013, 014, 015, 016 ]

Where we would start first Use a decision schedule for boundary, methodology, base year, target, measure portfolio, reporting and claims. Present options with cost, carbon, service and uncertainty. Record approvals and changed assumptions. Phrase outcomes as controllable deliverables and evidence-supported contributions, reserving executive choices to authorised client owners. [ 003, 011, 012, 013, 014, 015, 016 ]

Handover must preserve the ability to recalculate and improve

Evidence-linked insight · What this changes Inventories and pathways are living systems. New factors, meters, assets, contracts and measures require future updates. A final dashboard without raw evidence, calculation logic, access rights, owners and instructions can lock the buyer into one supplier while weakening auditability. [ 008, 009, 010, 012, 014 ]

Where we would start first Deliver an indexed evidence pack: boundary and method, data dictionary, source lineage, factor register, calculation files, target approvals, measure pipeline, contract reports, issues, licences and update calendar. Test exports and knowledge transfer. Remove or return client data securely while retaining only records permitted by the contract. [ 008, 009, 010, 012, 014 ]

Relevant anonymised case study

Securing a lower-five-figure public-sector award for hospital net-zero consultancy

An anonymised Bid Champions client was selected by NHS foundation trust to provide hospital net-zero consultancy. The public award record places the opportunity in the below-£25,000 band.

Buyer
NHS foundation trust
Published value band
Below £25,000
Outcome
Contract award recorded

The precise tender-support workstream is confidential. The full case separates Bid Champions’ recorded support, the client’s solution and commitments, and the buyer’s award decision.

Read the complete case study

Live-pursuit check

What we would verify before fixing the strategy.

For a live opportunity, we would recheck the applicable law and standards, the buyer's latest notice and documents, qualification route, amendments, commercial assumptions and delivery conditions. This keeps the analysis useful without treating a general market position as a substitute for the actual competition.

Priority public records to recheck: PPN 006: Taking account of Carbon Reduction Plans in the procurement of major government contracts; PPN 016: Carbon Reduction Contract Schedule; Greenhouse gas reporting: conversion factors 2026; Climate Services for a Net Zero Resilient World 2; ESG and Sustainability System; Engineering and Regeneration Professional Services Framework; Positive Energy District Strategy and Action Plan.

Independent verification checks

The public references supporting the evidence points above remain available so a bidder, specialist or decision-maker can test the position against the original authority.

Open 16 public references used to test this sector position
  1. Procurement Act 2023 — UK Parliament / legislation.gov.uk
  2. Procurement Regulations 2024 — UK Parliament / legislation.gov.uk
  3. Climate Change Act 2008 — UK Parliament / legislation.gov.uk
  4. Environment Act 2021 — UK Parliament / legislation.gov.uk
  5. Companies (Directors' Report) and Limited Liability Partnerships (Energy and Carbon Report) Regulations 2018 — UK Parliament / legislation.gov.uk
  6. Energy Savings Opportunity Scheme Regulations 2014 — UK Parliament / legislation.gov.uk
  7. PPN 006: Taking account of Carbon Reduction Plans in the procurement of major government contracts — Cabinet Office
  8. PPN 016: Carbon Reduction Contract Schedule — Cabinet Office
  9. Greenhouse gas reporting: conversion factors 2026 — Department for Energy Security and Net Zero
  10. Environmental Reporting Guidelines: Including streamlined energy and carbon reporting guidance — Department for Business, Energy and Industrial Strategy
  11. Government Property Sustainability Strategy 2022-2030 — Government Property Function
  12. Sustainability Reporting Guidance 2025-26 — HM Treasury
  13. Climate Services for a Net Zero Resilient World 2 — Department for Energy Security and Net Zero / Find a Tender
  14. ESG and Sustainability System — City of London Corporation / Find a Tender
  15. Engineering and Regeneration Professional Services Framework — Hull City Council / Find a Tender
  16. Positive Energy District Strategy and Action Plan — Derry City and Strabane District Council / Find a Tender